DISCOM Solar Policy & Net Metering Regulations (2026)

Audited regulatory framework governing grid-tied rooftop solar interconnection, transformer capacity quotas, banking fee structures, and surplus energy compensation across India.

Table 4: DISCOM Net Metering Interconnection Limits, Banking Rules & Settlement Cycles
DISCOM / Utility State Max Capacity (% Load) DT Capacity Cap Banking Settlement Surplus Compensation Policy Status
MSEDCL / Adani / Tata Maharashtra 100% of Sanctioned Load 70% of DT Rating Annual (March 31) APPC Rate (~₹3.15/kWh) Active (MERC 2024 Orders)
UPPCL (DVVNL/PVVNL/MVVNL) Uttar Pradesh 100% of Sanctioned Load 80% of DT Rating Annual (March 31) APPC Rate (~₹2.80/kWh) Active (UPERC RPS 2024)
DGVCL / MGVCL / PGVCL / UGVCL Gujarat 100% of Sanctioned Load 75% of DT Rating Annual (March 31) ₹2.25/kWh (Surya Gujarat) Active (GERC Net Billing)
BRPL / BYPL / TPDDL Delhi (NCT) 100% up to 10 kW 80% of DT Rating Annual (March 31) APPC Rate + ₹3.00 GBI Active (Delhi Solar Policy 2024)
BESCOM / HESCOM / MESCOM Karnataka 100% of Sanctioned Load 80% of DT Rating Annual (September 30) APPC Rate (~₹2.90/kWh) Active (KERC Guidelines)
JVVNL / AVVNL / JdVVNL Rajasthan 100% of Sanctioned Load 70% of DT Rating Annual (March 31) APPC Rate (~₹3.05/kWh) Active (RERC Regulations)
TANGEDCO Tamil Nadu 100% of Sanctioned Load 70% of DT Rating Monthly ToD Billing Feed-in Tariff (75% of APPC) Active (TNERC Orders)
TSSPDCL / TSNPDCL Telangana 100% of Sanctioned Load 80% of DT Rating Annual (March 31) APPC Rate (~₹3.20/kWh) Active (TSERC Orders)
KSEB Kerala 100% of Sanctioned Load 75% of DT Rating Annual (September 30) APPC Rate (~₹3.10/kWh) Active (KSERC Orders)
PSPCL Punjab 100% of Sanctioned Load 80% of DT Rating Annual (March 31) APPC Rate (~₹2.75/kWh) Active (PSERC Regulations)

Regulatory Deep Dive: Grid Interconnection Caps & Distribution Transformer Constraints

Connecting a residential rooftop solar system to the public grid requires strict compliance with Central Electricity Authority (CEA) technical regulations and state SERC orders. The two primary regulatory gating factors every homeowner must understand are:

1. Sanctioned Connected Load Constraint

In virtually all Indian states, your maximum allowable rooftop solar inverter capacity cannot exceed 100% of your sanctioned connected electricity load. If your electricity bill indicates a sanctioned load of 2 kW, your DISCOM will not approve a net meter application for a 3 kW or 5 kW system.

Actionable Remedy: If you wish to install a 3 kW solar array to capture the maximum ₹78,000 PM Surya Ghar central subsidy, you must first apply for a connected load extension through your DISCOM's consumer portal (upgrading from 1 kW or 2 kW to 3 kW) before submitting your solar commissioning application.

2. Distribution Transformer (DT) Capacity Quotas

To maintain grid stability and prevent reverse-power overvoltage on neighborhood distribution feeders, SERC regulations cap the total cumulative solar capacity connected to any local distribution transformer (DT)—typically at 70% to 80% of the transformer's rated kVA capacity.

Because rooftop solar adoption is first-come, first-served, early adopters in a neighborhood lock in the available transformer quota. Once a local transformer reaches its 70%–80% threshold, subsequent solar applications are placed on technical hold until the DISCOM upgrades the transformer infrastructure.

Gross Metering vs Net Metering vs Virtual Net Metering: Comprehensive Comparison

Understanding your utility's interconnection model is critical because it dictates how every generated kilowatt-hour is credited:

  • Standard Net Metering (1:1 Energy Banking): The bidirectional meter records energy imported from the grid and energy exported from your rooftop array. At the end of each billing cycle, your net bill equals (Imported Units - Exported Units) × applicable slab tariff. Surplus units roll forward to subsequent months until annual settlement.
  • Net Billing / Feed-in Tariff: Energy imported is billed at standard retail slab rates. Energy exported to the grid is purchased by the DISCOM at a fixed lower feed-in rate (typically APPC, around ₹2.25 to ₹3.15/kWh). The credit is deducted monetary-wise from your monthly energy bill.
  • Virtual Net Metering (VNM): Pioneered in Delhi under the Delhi Solar Policy, VNM enables residential apartment owners or tenants with zero rooftop ownership to co-invest in a community solar array located elsewhere in the city. Generation credits are divided proportionally and deducted from each subscriber's personal electricity bill.
  • Group Net Metering (GNM): Allows consumers with multiple electricity service connections within the same DISCOM jurisdiction to offset solar energy generated at one location (e.g. an ancestral home or factory) against the electricity consumption of another connection (e.g. a residential flat).

State Banking Settlement Schedules & Forfeiture Rules

Most state regulatory orders mandate an annual true-up settlement on March 31st. If your solar system produced more electricity over the year than your household consumed, the DISCOM settles the remaining credit balance. Consumers must ensure their system is sized so that annual surplus does not exceed 10%–15% of annual consumption, preventing surplus forfeiture under restrictive state banking limits.

Frequently Asked Questions on DISCOM Policies

What is the difference between net metering and gross metering?
In net metering, imported and exported electricity are offset against each other, and you pay only for net consumed units. In gross metering, all solar power generated is sold to the utility at a lower predetermined feed-in tariff, while all power you consume is billed at standard retail rates.
How do I increase my sanctioned load to qualify for a larger solar system?
Log into your DISCOM customer portal, select "Load Enhancement / Load Extension", upload your latest electricity bill and identity proof, and pay the nominal load enhancement fee. Most DISCOMs process load extensions within 7–14 days.