1. Delhi Rooftop Solar Pricing & Subsidy Matrix (2026)
Under the combined framework of the central PM Surya Ghar Muft Bijli Yojana and the Delhi Solar Policy, residential consumers receive an upfront Central Financial Assistance (CFA) subsidy plus a direct 5-year Generation-Based Incentive (GBI) credited to their monthly power bills.
| System Size | Gross Turnkey Cost | Central CFA Subsidy | Net Consumer Cost | Delhi GBI Earnings (5 Yrs) | Estimated Payback |
|---|---|---|---|---|---|
| 1 kW | ₹60,000 – ₹70,000 | ₹30,000 | ₹30,000 – ₹40,000 | ₹21,600 (₹3.00/unit) | 2.5 Years |
| 2 kW | ₹1,15,000 – ₹1,30,000 | ₹60,000 | ₹55,000 – ₹70,000 | ₹43,200 (₹3.00/unit) | 2.6 Years |
| 3 kW (Most Popular) | ₹1,65,000 – ₹1,85,000 | ₹78,000 | ₹87,000 – ₹1,07,000 | ₹64,800 (₹3.00/unit) | 2.8 Years |
| 5 kW | ₹2,60,000 – ₹2,90,000 | ₹78,000 (Capped) | ₹1,82,000 – ₹2,12,000 | ₹72,000 (₹2.00/unit) | 3.2 Years |
| 10 kW | ₹4,80,000 – ₹5,40,000 | ₹78,000 (Capped) | ₹4,02,000 – ₹4,62,000 | ₹1,44,000 (₹2.00/unit) | 3.4 Years |
2. Delhi Generation-Based Incentive (GBI): How It Works
Delhi is the only union territory in India where the government actively pays you cash for every unit of solar power you generate, regardless of whether you consume it at home or feed it to the grid.
- Systems up to 3 kW: Receive ₹3.00 per kWh generated for 5 consecutive years from commissioning.
- Systems between 3 kW and 10 kW: Receive ₹2.00 per kWh generated for 5 consecutive years.
- Direct DISCOM Bill Credit: GBI earnings are automatically calculated from your generation meter reading and deducted from your electricity bill every month. If your GBI exceeds your bill, the surplus credit rolls over or is deposited directly to your bank account!
3. DISCOM Jurisdiction & Net Metering Rules in Delhi
Power distribution across the National Capital Territory is managed by three primary distribution companies under Delhi Electricity Regulatory Commission (DERC) regulations:
⚡ BSES Rajdhani (BRPL)
Serves South and West Delhi (Vasant Kunj, Saket, Dwarka, Janakpuri). Offers direct online feasibility approval via the BSES Delhi Solar portal. Net meter installation timeline is 15 to 25 days.
⚡ BSES Yamuna (BYPL)
Serves East and Central Delhi (Laxmi Nagar, Mayur Vihar, Chandni Chowk, Daryaganj). Synchronizes with the PM Surya Ghar national portal with expedited CA number verification.
⚡ Tata Power-DDL (TPDDL)
Serves North and Northwest Delhi (Rohini, Pitampura, Model Town). Known for strict DCR serial number verification and digital smart meter testing within 10 days of physical installation.
4. Virtual Net Metering (VNM) for Group Housing Societies
A key innovation in Delhi is Virtual Net Metering (VNM) and Group Net Metering (GNM). In Cooperative Group Housing Societies (CGHS) and multi-story apartment complexes across Dwarka, Rohini, and Mayur Vihar, individual flat owners cannot mount panels on shared roofs.
Under DERC rules, the society management can install a common solar system on the community rooftop. The total electricity generated is credited proportionately across the individual electricity meters of participating flat owners. This completely eliminates high common-area electricity bills (lifts, water pumps, corridor lighting) and passes direct savings to residents.
Explore the complete Delhi Solar Directory
Every guide below is fully updated with June 2026 regulations, local DISCOM guidelines, and DCR hardware standards. Choose a directory path to begin:
💰 Costs, Subsidy & Loans
Calculate your PM Surya Ghar central CFA subsidy and direct state-level top-up incentives.
Detailed cost breakdown, panel requirements, and estimated savings for standard 3kW homes.
Budget guidelines, roof area analysis, and solar ROI timeline for larger 5kW installations.
Compare pricing on Mono PERC, Bifacial, and Polycrystalline panels across active ALMM brands.
Evaluate collateral-free EMI options, interest rates, and loan terms from SBI, PNB, and SIDBI.
Examine utility slab charges and fixed fees to accurately calculate your solar monthly offsets.
📋 Net Metering & Connections
Understand banking cycles, surplus rollover credits, and bi-directional meter testing procedures.
Navigate portal logins, load feasibility clearance checks, and meter sync protocols.
Browse the directory of empanelled, ALMM-compliant installers offering 5-year warranties.
Error-free checklist of IDs, bills, society NOCs, and ownership proofs for smooth approvals.
Track expected portal milestones from initial registry to final DBT bank account transfer.
Prevent net meter sealing delays, sanctioned load mismatch rejections, and portal sync lags.
Understand eligibility requirements under PM Surya Ghar and state electrification schemes.
⚙️ Sizing, Tech & Care
Sizing rules, structural loads, and configuration standards for housing rooftop solar.
Accelerated depreciation, tax offsets, CAPEX/OPEX models, and high-capacity system setups.
How grid-connected systems offset energy bills, grid tie-ins, and anti-islanding mechanics.
Stand-alone batteries, battery controllers, off-grid backup configs for rural/frequent powercut areas.
Prevent cell degradation, monitor inverter output, clean panels safely, and handle CMC claims.
Examine Tier-1 manufacturers, module efficiency ranks, and domestic component warranties.
Important local DISCOM note:
Always verify grid feasibility through your local subdivisional office. Applications for connections exceeding 10kW require custom structural load clearance and local transformer availability checks.
Frequently Asked Questions (Local Delhi Policy)
What is the Generation-Based Incentive (GBI) in Delhi? +
The Delhi Government pays ₹3.00 per unit generated for systems up to 3kW, and ₹2.00 per unit for 3kW-10kW systems, directly credited to your DISCOM bills for 5 years after commissioning.
Does Delhi support Virtual Net Metering? +
Yes, Delhi Electricity Regulatory Commission (DERC) allows Virtual Net Metering, making it possible for group housing societies (CGHS) to install a shared solar setup and offset individual flat bills.
What is the maximum solar capacity allowed in Delhi? +
Rooftop solar system size cannot exceed 100% of the active sanctioned load linked to your BSES or Tata Power utility connection.