Explore the complete Uttar Pradesh Solar Directory
Every guide below is fully updated with June 2026 regulations, local DISCOM guidelines, and DCR hardware standards. Choose a directory path to begin:
💰 Costs, Subsidy & Loans
Calculate your PM Surya Ghar central CFA subsidy and direct state-level top-up incentives.
Detailed cost breakdown, panel requirements, and estimated savings for standard 3kW homes.
Budget guidelines, roof area analysis, and solar ROI timeline for larger 5kW installations.
Compare pricing on Mono PERC, Bifacial, and Polycrystalline panels across active ALMM brands.
Evaluate collateral-free EMI options, interest rates, and loan terms from SBI, PNB, and SIDBI.
Examine utility slab charges and fixed fees to accurately calculate your solar monthly offsets.
📋 Net Metering & Connections
Understand banking cycles, surplus rollover credits, and bi-directional meter testing procedures.
Navigate portal logins, load feasibility clearance checks, and meter sync protocols.
Browse the directory of empanelled, ALMM-compliant installers offering 5-year warranties.
Error-free checklist of IDs, bills, society NOCs, and ownership proofs for smooth approvals.
Track expected portal milestones from initial registry to final DBT bank account transfer.
Prevent net meter sealing delays, sanctioned load mismatch rejections, and portal sync lags.
Understand eligibility requirements under PM Surya Ghar and state electrification schemes.
⚙️ Sizing, Tech & Care
Sizing rules, structural loads, and configuration standards for housing rooftop solar.
Accelerated depreciation, tax offsets, CAPEX/OPEX models, and high-capacity system setups.
How grid-connected systems offset energy bills, grid tie-ins, and anti-islanding mechanics.
Stand-alone batteries, battery controllers, off-grid backup configs for rural/frequent powercut areas.
Prevent cell degradation, monitor inverter output, clean panels safely, and handle CMC claims.
Examine Tier-1 manufacturers, module efficiency ranks, and domestic component warranties.
Important local DISCOM note:
Always verify grid feasibility through your local subdivisional office. Applications for connections exceeding 10kW require custom structural load clearance and local transformer availability checks.
Frequently Asked Questions (Local Uttar Pradesh Policy)
How much state subsidy top-up does Uttar Pradesh provide? +
UP offers an additional state subsidy of ₹15,000 per kW up to 2kW, capped at a maximum of ₹30,000. This is in addition to the central PM Surya Ghar subsidy.
What is the maximum total subsidy for a 3kW system in UP? +
A 3kW system qualifies for ₹78,000 (Central) + ₹30,000 (State Top-up) = ₹1,08,000 total subsidy, making UP one of the most affordable states for installation.
How do I claim the UP State solar top-up? +
After registering and getting commissioned via the national portal, you must upload your documents to the UPNEDA portal to release the state top-up.